What a World-Class Maintenance Planning Meeting Actually Looks Like

1746016941516

If your maintenance planning meetings feel like a waste of time—or worse, if you’re not holding them at all—chances are your team is constantly reacting instead of executing.

A great planning meeting doesn’t take hours. It’s short, focused, and drives action. Here’s what it actually looks like—and how to run one that gets real results.

The Goal: Clarity and Commitment

A well-run maintenance planning meeting aligns your team around:

– What’s getting done this week

– What’s not getting done (and why)

– What parts, labor, or production access you’ll need

– How to eliminate surprises

It’s not about filling time. It’s about making the next 5–7 days run smoother with fewer interruptions.

Who Should Be in the Room?

– Maintenance Planner/Scheduler – owns the schedule, tracks backlog, updates progress

– Maintenance Supervisor or Lead – confirms labor availability, priority jobs

– Operations Representative – flags production windows and access conflicts

– Optional: Inventory or Reliability Lead – addresses parts availability or long-term root cause items

Keep the group small enough to be nimble, but cross-functional enough to be aligned.

Meeting Structure (30 Minutes or Less)

1. Review Completed Work

What was planned vs. completed last week? If something slipped, why?

2. Review Backlog and Deferred Work

Are we building backlog? What critical work is waiting on parts, access, or info?

3. Review This Week’s Schedule

Are all jobs fully planned?

Are the right people and parts in place?

Are there any conflicts with production or safety?

4. Adjust and Confirm

Shift, add, or remove jobs based on what’s realistic. Lock it in before the week starts.

5. Call Out Any High-Risk Items

Any job with a risk of overrunning time, interfering with production, or requiring extra coordination should be clearly flagged.

Tips to Make It Work

– Use a visual schedule (whiteboard, spreadsheet, or CMMS dashboard)

– Stick to the schedule—don’t let the meeting drift

– Focus on execution, not strategy or long-term projects

– End with clear takeaways and owners

Why It Matters

World-class maintenance isn’t about doing more—it’s about planning better. A 30-minute meeting can prevent days of confusion, missed work, and unplanned downtime.

If your planning meetings aren’t driving results, it’s not the people—it’s the structure.